Manufacturer product rendering. Quoted configuration may differ.HY2MW-BESS
2 MWh initial energy · Containerised
Containerised battery storage for larger off-grid project enquiries. The manufacturer lists 2,000 kWh initial battery energy; the PCS, usable energy and off-grid operating capability must be confirmed for your site.
Typically 6–10 weeksUnless local stock is available. Timing confirmed with your quotation.
Storage for a bigger off-grid brief.
Confirm the island-mode PCS, black-start capability, load steps, generator coordination, protection and controls before equipment selection. Civil works, transport, lifting and commissioning are defined in the project quotation.
HY2MW-BESS is the manufacturer model name. It is not a confirmed 2 MW AC output rating.
Technical starting points
- Initial battery energy
- 2,000 kWh (2 MWh)
- Battery chemistry
- Lithium iron phosphate (LFP)
- Format
- 40-foot container (manufacturer listing)
- Listed nominal DC voltage
- 716.8 V
- Off-grid AC configuration
- To be specified for the project
- System scope
- Site-specific quotation
Source:Enerlution HY2MW-BESS manufacturer page. Final equipment specifications and off-grid operating limits are confirmed with the quotation.
English product information.
Only the four systems offered by Kiwivolt are included. BCH-100230 uses the relevant manufacturer catalogue pages. The other model overviews identify their sources and configuration details that require confirmation.
Start with your
off-grid brief.
Tell Kiwivolt what needs to run, where it will operate and how long it needs to last. We will scope the equipment and provide an individual quotation.
- Peak loads and daily energy use
- Solar, generator and existing equipment
- Site access and delivery requirements
Typically 6–10 weeksUnless local stock is available. Timing confirmed with your quotation.
