Manufacturer product rendering. Quoted configuration may differ.HY1MW-BESS
Containerised · Configuration on enquiry
Discuss an Enerlution HY1MW-BESS configuration for your off-grid project. Kiwivolt will confirm the current model-specific technical schedule before issuing an equipment proposal.
Typically 6–10 weeksUnless local stock is available. Timing confirmed with your quotation.
Define the project. Then define the system.
Power, energy capacity, voltage, frequency and PCS scope must be confirmed together. Do not select this system from the model name alone; share your load profile so the proposed configuration can be checked.
Manufacturer configuration confirmation is required before this model can be specified or ordered.
Technical starting points
- Manufacturer model
- HY1MW-BESS
- Format
- Containerised storage
- Battery energy
- To be confirmed for the quoted configuration
- Off-grid output
- To be confirmed for the quoted configuration
- Supply frequency
- NZ 50 Hz configuration to be confirmed
- Ordering
- Project quotation only
Source:Enerlution HY1MW-BESS manufacturer page. Final equipment specifications and off-grid operating limits are confirmed with the quotation.
English product information.
Only the four systems offered by Kiwivolt are included. BCH-100230 uses the relevant manufacturer catalogue pages. The other model overviews identify their sources and configuration details that require confirmation.
Start with your
off-grid brief.
Tell Kiwivolt what needs to run, where it will operate and how long it needs to last. We will scope the equipment and provide an individual quotation.
- Peak loads and daily energy use
- Solar, generator and existing equipment
- Site access and delivery requirements
Typically 6–10 weeksUnless local stock is available. Timing confirmed with your quotation.
